- Broward County Public Schools
- District Construction
- Design Standards
Procurement & Warehousing Services
Page Navigation
Design Standards
-
The goal of these Standards is to ensure district wide uniformity, establish a level of construction quality, and provide safe and functional environments conducive to learning. LEED for Schools criteria has been integrated into these Standards as a means of achieving environmentally sustainable sites and buildings and meaningful environmental and health benefits for the students, teachers, and staff. They are intended to provide principles consistent with community values, ease of maintenance, and lower facility life cycle costs. These Standards are periodically reviewed and updated by district staff to address the inclusion of new products, construction methods, applicable building codes and reference standards.
Download and Use:
Project Consultants shall use the Design and Material Standards as master guide documents for their Construction Specifications. Project Consultants shall amend the D&MS as necessary to be project specific.
Updates:
A plus symbol will identify updated documents and new documents on this webpage and a revision date will appear in the footer of any updated document. Errors, Omissions or Comments:
For any questions or comments please contact divine.amoah@browardschools.com or call us at (754) 321-1500.
DOCUMENT SUBMITTAL CHECKLIST
-
Document Submittal Checklist for Plan Review (rev. 07/2015)
Document Submittal Checklist for Plan Review rev. 07-07-15.doc 1,006.5 KB (Last Modified on September 8, 2017)
DESIGN CRITERIA
-
Mechanical Design Criteria-Generic-Section 2A-6A(rev.9-27-12)
Mechanical Design Criteria-Generic-Section 2A-6Arev.9-27-12.doc 225.5 KB (Last Modified on September 8, 2017)
DESIGN CRITERIA
-
Section 2A-6A Mechanical Design Criteria (rev. 1-25-12)
Section 2A-6A Mechanical Design Criteria rev. 1-25-12.doc 224.5 KB (Last Modified on September 8, 2017) -
Section 2A-8 Voice, Data, and Video Struct Cab System Design Criteria
Section 2A-8 Voice Data and Video Struct Cab System Design Criteria.doc 150 KB (Last Modified on September 8, 2017) -
Section_2A-2+_Architectural_Design_Criteria_rev._08-11-09[1
Section 2A-8 Voice Data and Video Struct Cab System Design Criteria.doc 150 KB (Last Modified on September 8, 2017)